风火山隧道穿越地下冰层施工技术(3)

与我共老 分享 2021-09-28 下载文档

stress,andthepossibilityofpenetrationcracksduetotemperaturedifference.Measureswereraisedforpreventionofsurfacecracks.Keywords Qinghai2TibetRailway,severecoldarea,concrete,microcrackDesignCharacteristicsofBeipanjiangRiverBridgeonShuibaiRailway

ChenKejian

Abstract ANSYSwasusedtoestablishafiniteelementmodelofthebox2shaped

concretearchbridgewithtwoequalspans,andananalysisofdynamicpropertywaspreformed,andmeasuredimpulsedatawasusedtoverifytheanalysisresult.Responsespectrummethodandtime2historymethodwasusedforanalysisoflongi2tudinal,transversal,andverticalearthquakeresponse.Keywords highwaybridge,box2shapedarchbridge,modalanalysis,responsespectrum,earthquakewave,time2historyresponse

DesignandComputationoftheBridgedGutterforShenzhenReservoir

HeXiaobin

Abstract ThemainbridgeofBeipanjiangRiverBridgefeatures236mupperloadingsteeltubularconcretearch.Anintroductionisgiventotheuniquetech2nologyusedlikegussetplateconnectingtop,bottomchordtubeandwebmember,theЖ2shapedtransversebracingforarchrib,rigidframepierbearing,andΠ2shapedreinforcedconcreterigidframe,etc,andtosuchdesignsasswingingbodyconstruction,ballhingeforswinging,concretepouringsequenceinsidearchrib,andswinginghingefortemporaryuseatthefootofarch,etc.Keywords BeipanjiangRiverBridge,railwaybridge,archbridge,steeltubularconcrete,structuraldesign,swingingbodyconstruction

AnalysisoftheReliabilityofSurfaceDeformationofShieldTunnelBasedonNumericalSimulation

SongKezhi,WangMengshu

Abstract ThebridgedgutterforShenzhenReservoiristhelargestsurfacestruc2tureofthewatersupplynetworkinShenzhen.Prestressingtechnologywasusedtoincreasethelongitudinalspanoftheboxconcretegutterandtoimproveitscrack2proofandseepage2proofperformance.Anintroductionisgiventothedesignofthegutterandcomputationofstaticforce.Keywords prestress,boxgutter,design,computation,ShenzhenReservoirDynamicAnalysisoftheSinglePylonCable2stayedYintanBridgeoverYel2lowRiver

LiuLan

Abstract Thepaperpointsout,basedontheanalysisofcausesforgroundsur2facedeformationinducedbyshieldtunnel,thattheparameteroftunnelrockandshieldexcavationwillcausedisturbancetorockmasswithgreatrandomness,thusresultintheuncertaintyofsurfacedeformation.ANSYSfiniteelementprogramwasusedfornumericalsimulationtesttoobtaindeformationdata,andonthebasisofwhich,primaryimpactelementwasdefinedrandominputvariate,andsurfacedeformationwasdefinedrandomoutputvariate.Monte2Carlomethodwasusedtosimulatethestatisticsofsurfacedeformation,andacomputationofprobabilityoffailureanddegreeofreliabilitywasconducted.Keywords shield,surfacedeformation,random,degreeofreliabilityConstructionofFenghuoshanTunnelPassingUndergroundIceLayer

CaoXinfeng

Abstract Anoverallcomputationandanalysiswasmadeofthepylon,andthe

impactofmaingirderlongitudinalandtransverseelasticconfinementonthedy2namicpropertyandearthquakeresponseofthemainbridge,includingestablish2mentofcomputationmodel,computationofdynamicproperty,http://www.77cn.com.cnputationresultindicatedthatelasticconfinementforop2erationandthefloatsystemforearthquakehavehighaseismicperformance.Keywords singlepyloncable2stayedbridge,floatsystem,elasticconfinement,dynamicanalysis

DesignLoadofRailwayFerryTrestleBridgeovertheSea

LiXiaojiang,YanGuiping

Abstract Anintroductionisgiventoeffectivemeasuresagainstthedeepunder2

groundicelayer,whicheasilythawsandcollapseswhenheated.Suchmeasuresinclude,smoothblastwithlesschargevolume,heatinsulation,coldairventila2tioninsummer,rapidandeffectivesealingofsurroundingrock,acceleratingtheliningoftunnel,installationofheat2insulatingslab,andmonitoringoftempera2ture,etc.Keywords railwaytunnel,plateautunnel,undergroundicelayer,constructiontechnology

DesignofCable2stayedSteelStructureCanopy

LiHongbiao,YuYang

Abstract Railwayferrytrestlebridgeovertheseaoperatesunderspecialcondi2tionsandbearstheeffectoftide,wind,rain,andwave,etc.Thespecialfunc2tionandstructureofthebridgereceivesspecialactionforce.Thecomputationmethodoftheforce,classificationofload,andprinciplesforloadcombinationwasputforward.Keywords railwayferry,trestlebridge,load,designCausesforEarlyStageCracksontheSurfaceofConcreteStructureatSe2vereColdAreaandPreventativeMeasures

Abstract Ananalysiswasmadeoftheselectionofinitialtensionalforceofthecable2stayedcanopy,theforce2bearingcharacteristics,andthedesignofrelevantmembersandnodaljoints.Arationalforcestructurewasobtained.Keywords steelstructurecanopy,cable2stayedsystem,initialstress,displace2ment


风火山隧道穿越地下冰层施工技术(3).doc 将本文的Word文档下载到电脑

下一篇:2012高考数学冲刺(技巧篇2)

相关推荐
相关阅读
本类排行
× 游客快捷下载通道(下载后可以自由复制和排版)

下载本文档需要支付 7 元

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:xxxxxx QQ:xxxxxx