土木(建工)2011届毕业设计任务书20110112(1)(10)

落魂花 分享 2021-06-02 下载文档

毕业设计任务书

Abstract

Wind Turbine directly drives three-phase permanent magnetic synchronous generator togenerate electricity in existing mall-scale wind power generation system. Then ncontrolled bridge changes the three-phase AC into DC which is used to charge the battery. The inverter turns DC from the battery into AC which is needed by load. The main problem in the existing system is that maximum power control is separate from charging and discharging control.

A power electronic interface between rectifier and battery is designed to improve the running performance of current small-scale wind power eneration system and solve the problems to a certain extent that available system has. The power electronic interface is composed of two modules. The first module is used for load power control .According to the relationship between wind energy and load power, it adjusts the power to automatically match or track load power point. The second one is the charging and discharging control module. The module is used to charge the battery correctly according to the charge curve.

A charge circuit is designed to rightly charge the battery when the output voltage of the Wind Power Generator is changed greatly.

Keywords:wind power generation; DC-DC converter; power point tracking;

constant voltage charging


土木(建工)2011届毕业设计任务书20110112(1)(10).doc 将本文的Word文档下载到电脑

下一篇:塑料日用包装项目可行性研究报告(发改立项备案+2013年最新案例范文)详细编制方案

相关推荐
相关阅读
本类排行
× 游客快捷下载通道(下载后可以自由复制和排版)

下载本文档需要支付 7 元

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:xxxxxx QQ:xxxxxx