低电压穿越(LVRT)要求及测试 - 图文

loading 分享 2026-8-23 下载文档

Low-Voltage Ride Through (LVRT)Requirements and Testing低电压穿越(LVRT)要求及测试Dr.-Ing. Karl-Heinz WeckForschungsgemeinschaft für Elektrische Anlagen undStromwirtschafte.V.

Wind power in Germany德国风力发电

??State 30th June 2007??2007年6月30日状况

??Installed: 21,3 GW??装机容量:21.3 GW??Number: 18.700WEA ??台数:18700 台??Generated: 37,5 TWh??发电量:37.5TWh??Energy Share: 6,9%??能源比例:6.9%

1

LVRT Workshop Beijing 06./07. January 2009

Weck: LVRT requirements and testing

Wind power in Germany德国风力发电Prognosis for 20202020年目标

On land陆上On sea海上

2

LVRT Workshop Beijing 06./07. January 2009Weck: LVRT requirements and testing

History of Grid Codes in Germany up to 2007德国并网导则发展历程(至2007年)

25000Installed Power in MW200001500010000500001990199219941996199820002002200420062008Year12Grid Codes Distribution Systems并网导则配电网部分3

LVRT Workshop Beijing 06./07. January 2009Weck: LVRT requirements and testing

345Installed Power in Germany德国装机容量

Installed Power Year 年份 装机容量 Total总计 GW Installed Power 装机容量 Wind energy 风能 GW 2000 123 6 (4,9%) 2007 125 22 (17,6%) 4

LVRT Workshop Beijing 06./07. January 2009Weck: LVRT requirements and testing


低电压穿越(LVRT)要求及测试 - 图文.doc 将本文的Word文档下载到电脑
搜索更多关于: 低电压穿越(LVRT)要求及测试 - 图文 的文档
相关推荐
相关阅读