德马格注塑机工艺参数优化的步骤指导 精品

loading 分享 2026-7-18 下载文档

步骤 4

采用正确的螺杆转速

Select the correct, optimum screw speed for the material being processed (see T.01 notes, Section 5 ). Use this single speed for the whole plasticising stroke

Set a back pressure of 5 to 10 bar (hydraulic).

Readjust dosing stroke to achieve 95-98% fill

Take sixteeen consecutive mouldings and determine the standard deviation of the weights.

Print out:

Page 50 Process Statistics

Why is it important to use the manufacturer’s recommended screw speed?

13

STEP FOUR RESULTS

Insert actual values in the relevant boxes Weight without holding pressureWeight with holding pressure Percentage fill Standard deviation (16 shots) Mean value Rangeminmax Dosing time (mean and range) Melt cushion (mean and range)Screw stop position (mean and range) Injection time (mean and range) Peak injection pressure, P inj. max Injection pressure at changeover, PN press. Changeover stroke % g 14

STEP FIVE

Optimise screw speed and back-pressure profile

Use the Dosing Profile page to slow down the screw rotation speed for the last 10% of the metering stroke.

Readjust dosing stroke to achieve 95-98% fill

Take sixteeen consecutive mouldings and determine the standard deviation of the weights.

Print out:

Page 21 Dosing Profiles Page 50 Process Statistics

What has happened to the Dosing Stop position?

15

STEP FIVE RESULTS

Insert actual values in the relevant boxes Weight without holding pressureWeight with holding pressure Percentage fill Standard deviation (16 shots) Melt cushion (mean and range)Dosing time (mean and range)Mean value Rangeminmax %g Screw stop position (mean and range) Injection time (mean and range) Peak injection pressure, P inj. max Injection pressure at changeover, PN press. Changeover stroke 16


德马格注塑机工艺参数优化的步骤指导 精品.doc 将本文的Word文档下载到电脑
搜索更多关于: 德马格注塑机工艺参数优化的步骤指导 精品 的文档
相关推荐
相关阅读